Excel Project 2

I started the project already and i had some issues with creating Pivot Table.

You just need to download the PDF file and continue from step 11. steps 1 to 10 has been completed already. You need to just complete from step 11 to 23.

There really not much left to do. The work can be done within an hour.

J ust download the pdf file which is the instructions and the Excel file with is the work already started and CONTINUE from steps 11.

Excel Project 2 – MS Excel
(Spring 2019)
Use the project description below to complete this activity (all the details are included in this document). For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title “Excel Project 2.” Click on Show Rubrics if the rubric is not already displayed.
Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities including charting, and written analysis and recommendations in support of a business enterprise.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in downtown. It has been operating since 2015 and each location summarizes its car rental revenue
quarterly. Both locations rent four classes of cars: economy, premium, hybrid, SUV. Rental revenue is maintained separately for the four classes of rental vehicles.
The data for this case resides in the file spring2019rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data file name. It is a text file (with the file type .txt).
Do not create your own data. You must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and decimal point variations for numeric data, but Arial 10 will be the default font and font size.

 

"Is this question part of your assignment? We Can Help!"